Sign in
In Chișinău, Moldova, this image captures a construction site where a large, dark gray pipe is being installed in a deep trench. The trench is open, with visible soil, rocks, and tree roots along its edges. A bright pink and white striped caution tape stretches across the foreground, indicating a hazardous area. In the background, a yellow excavator with the markings "PW95" and "20" is parked on the side of a road. Beyond the road, trees form a green canopy. A red car is also visible in the distance.
Dy

Aug 19, 2026, 5:03 PM

Chișinău, Moldova

Stake attention in this memory

progress
construction
underground
work
infrastructure

In Chișinău, Moldova, this image captures a construction site where a large, dark gray pipe is being installed in a deep trench. The trench is open, with visible soil, rocks, and tree roots along its edges. A bright pink and white striped caution tape stretches across the foreground, indicating a hazardous area. In the background, a yellow excavator with the markings "PW95" and "20" is parked on the side of a road. Beyond the road, trees form a green canopy. A red car is also visible in the distance.

Loading AttnAds…

transactions
revenues
stakers
Earliest
Latest
Highest stake

No transactions found

More from this user

More from Chișinău

Dy

Aug 19, 2026, 5:03 PM

Chișinău, Moldova

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.