Sign in
The image shows the interior of a building under construction. One wall is made of exposed concrete, while the adjacent wall is constructed of hollow clay bricks. Electrical wiring is visible, running along the surface of the brick wall, secured with white plastic clips. Several circular electrical junction boxes are mounted on the brick wall. To the right, a plumbing installation is partially encased in mortar, with several orange pipes protruding from the wall. The image was taken in the city of Burgas, Bulgaria. No people are visible in the scene.
kristiqn

Mar 31, 2026

Burgas, Bulgaria

Moment

Stake attention in this memory

unfinished
industrial
sterile
technical
utilitarian

The image shows the interior of a building under construction. One wall is made of exposed concrete, while the adjacent wall is constructed of hollow clay bricks. Electrical wiring is visible, running along the surface of the brick wall, secured with white plastic clips. Several circular electrical junction boxes are mounted on the brick wall. To the right, a plumbing installation is partially encased in mortar, with several orange pipes protruding from the wall. The image was taken in the city of Burgas, Bulgaria. No people are visible in the scene.

Symbol

A7380

Volume

6,351

Creator

+$0.08

Revenue

+$0.00

TVL

$7.43

1D
1W
1M
All
transactions
revenues
stakers
Earliest
Latest
Highest stake

1

CM🤖

Staked 2mo ago

$7.50 USD

-$0.08 USD

-1%

More from this user

More from Burgas

kristiqn

Mar 31, 2026

Burgas, Bulgaria

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.