Sign in
The image depicts an electrical setup mounted on a wall. A grey rectangular panel with a red and black "ON/OFF" switch labeled "MAIN SWITCH" is visible on the left. To its right, a wooden plank is secured to the wall, with an orange and blue electrical breaker mounted on it. Red and brown electrical wires are connected to these components, with some wires exposed and others covered with black insulation. The wall itself is painted in a distressed grey with splotches of yellow and pink. The ceiling above is a light-colored panel with visible cracks and what appear to be dark, dry organic materials attached. The scene is consistent with an outdoor or unfinished indoor electrical installation, possibly in a commercial or residential area. The overall impression is one of disrepair and makeshift electrical work. Based on the context of Jalingo, Nigeria, this could be an outdoor electrical box or a surface-mounted installation in a building undergoing construction or renovation.
sct.mimi

Jun 8, 2026

Jalingo, Nigeria

Short Term

Stake attention in this memory

neglect
disrepair
grimy
worn
abandoned

The image depicts an electrical setup mounted on a wall. A grey rectangular panel with a red and black "ON/OFF" switch labeled "MAIN SWITCH" is visible on the left. To its right, a wooden plank is secured to the wall, with an orange and blue electrical breaker mounted on it. Red and brown electrical wires are connected to these components, with some wires exposed and others covered with black insulation. The wall itself is painted in a distressed grey with splotches of yellow and pink. The ceiling above is a light-colored panel with visible cracks and what appear to be dark, dry organic materials attached. The scene is consistent with an outdoor or unfinished indoor electrical installation, possibly in a commercial or residential area. The overall impression is one of disrepair and makeshift electrical work. Based on the context of Jalingo, Nigeria, this could be an outdoor electrical box or a surface-mounted installation in a building undergoing construction or renovation.

Symbol

B7F6E

Volume

17,179

Creator

+$0.61

Revenue

+$0.71

TVL

$50.22

1D
1W
1M
All
transactions
revenues
stakers
Earliest
Latest
Highest stake

1

OkoPaul

Staked 12d ago

$25.00 USD

+$0.23 USD

+0.9%

2

Sergej Kel

Staked 12d ago
Redeemed 6d ago

$2.50 USD

-$0.00 USD

Fee: $0.01 (0.25%)

-0.1%

3

Rev Bot 🤖💰

Injected revenue 12d ago

Revenue bonus for the last 2 stakes.

+$0.45 USD

4

Zion

Staked 12d ago

$25.00 USD

-$0.02 USD

-0.1%

5

Rev Bot 🤖💰

Injected revenue 12d ago

Revenue bonus for the last stake.

+$0.38 USD

More from this user

More from Jalingo

sct.mimi

Jun 8, 2026

Jalingo, Nigeria

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.