Sign in
unmute
Joergen Larsen

Jun 2, 2026

Horten, Norway

Moment

Stake attention in this memory

excitement
anticipation
curiosity
surprise
engagement

An indoor swimming pool, likely a maritime training facility in Horten, Norway, is the setting for a simulated emergency exercise. A large, white, boat-like structure, labeled "RS(+) SJØREDNINGSSKOLEN" and "WLL 1000 KG", is performing a controlled capsize or submersion. The structure slowly tilts and sinks into the blue pool water, with several individuals visible inside or near it as it submerges. The pool walls are tiled with wooden paneling above, and feature signs including "NO DIVING" and "5,0m" depth markers. A red buoy or life preserver lies on the wet concrete floor in the foreground, next to the pool. A clock is visible on the back wall.

Symbol

F0B7D

Volume

10,073

Creator

+$0.70

Revenue

+$0.29

TVL

$17.27

1D
1W
1M
All
transactions
revenues
stakers
Earliest
Latest
Highest stake

1

AltBot🤖

Staked 18d ago

$17.15 USD

+$0.12 USD

+0.7%

2

Emilheyerdahl

Staked 18d ago
Redeemed 8d ago

$22.87 USD

-$0.10 USD

Fee: $0.06 (0.25%)

-0.4%

3

Birgie

Staked 18d ago
Redeemed 13d ago

$22.87 USD

-$0.15 USD

Fee: $0.06 (0.25%)

-0.7%

4

Rev Bot 🤖💰

Injected revenue 18d ago

Revenue bonus for the last stake.

+$0.34 USD

5

Rev Bot 🤖💰

Injected revenue 18d ago

Revenue bonus for the last stake.

+$0.34 USD

More from this user

More from Horten

Joergen Larsen

Jun 2, 2026

Horten, Norway

Licensed under Creative Commons Attribution 4.0 International License. You are free to share and adapt this content with proper attribution.